top of page

Microconcrete Pool | Brockhampton

When traditional tile systems fail in submerged environments, grout line breakdown and subsurface water migration can cause costly structural and aesthetic issues. For this pool refurbishment at Brockhampton, we executed a full surface overhaul, replacing failed finishes with a high-performance, joint-free microconcrete pool system.


Step-by-Step Restoration & Application Process:

  1. Diagnosis & Hacking: Stripped back the original compromised surface down to the solid concrete substrate to eliminate hollow spots and ensure zero adhesion issues.

  2. Substrate Preparation & Reinforcement: Precision surface grinding, specialized primer application, and installation of a crack-bridging structural mesh embedded within high-strength screed to prevent substrate movement from reflecting through.

  3. Microconcrete Topcoat Application: Hand-troweled multiple coats of waterproof mineral microconcrete across the pool basin, steps, and drainage features for a completely seamless profile.

  4. Mechanical Polishing & Water Filling: Refined and densified through a multi-stage mechanical polishing process rather than relying on topical film sealers. Once filled, the polished mineral matrix reveals a serene, natural resort-style aqua water tone


Why Choose Polished Microconcrete for Swimming Pools?

  • No Topical Sealer Maintenance: Mechanically polished surface means zero risk of topcoat peeling, flaking, or delaminating underwater over time.

  • Zero Grout Lines: Eliminates the primary failure point of traditional pool tiles.

  • Slip-Resistant & Tactile: Safe underfoot for steps, shallow ends, and pool floor surfaces.

  • Chemical & UV Resistant: Formulated specifically to endure continuous submersion, chlorine, and tropical weather without degradation.



BEHIND-THE-SCENES

Part 1: Identifying the Pool Failure & Initial Issues

Part 2: Hacking & Substrate Removal

Part 3: Surface Grinding, Priming, Screed & Mesh Reinforcement

Part 4: Hand-Applying the Microconcrete Topcoat

Part 5: Final Result Filled with Water

bottom of page